As winter sets in, the Water and Power Ministry has claimed that the residential consumers in Pakistan will not have to deal with the menace of load shedding.
According to the National Transmission and Despatch Company (NTDC) spokesman, electricity demand in Pakistan is currently 11,000 MW, while 9,800 MW are being generated. The electricity shortfall has decreased to 1,200 MW which will lead to an end of load shedding for residential consumers.
The spokesman added that hydel generation is contributing 3,740 MW and thermal generation is contributing 1,515 MW to the national grid. 4,545 MW are also being generated by the independent power projects (IPPs).
mubarik ho pakistan
kya baat he hamari keh load sheding band ho gae laiken kab tak??????
Comments are closed.