LESCO grid operation & transmission system likely to be handed over to NTDC

0
131

The Lahore Electric Supply Company (LESCO) grid system operations are likely to be handed over to the National Transmission and Despatch Company (NTDC), reported a national daily. The NTDC will run 132 KV grid stations along with transmission system while the LESCO will be confined to the distribution and billing operations. Sources have revealed that Read More